3 Followers
This Old House on IMDB
First Aired: January 1st, 1979
Status: Continuing
Network: PBS
Summary: TV's original home-improvement show, following one whole-house renovation over several episodes.
Next Episode:
New episode date is not available for now
Episode Statistics:
# of Episodes: 1155
# of Episodes I watched: 0
# of Episodes I haven't watched: 1155
Last Episode I watched: -
Episode Summaries
My Season Progress: 
0 %
Season 33
Episode 1: Bedford | Welcome to the Bedford Project
Air Date: October 6th, 2011
Summary: Work begins on a 300-year-old farmstead.
Episode 2: Bedford | And the Work Begins
Air Date: October 13rd, 2011
Summary: The crew transplantis shrubs and plants to a safe place until the job is complete. They also clear small trees and overgrowth that are in the way of the new family room addition.
Episode 3: Bedford | Work on the Addition Begins
Air Date: October 20th, 2011
Summary: The crew removes old clapboards and opens up a hole in the old fieldstone foundation that will connect the old basement space to the new. They also patch a rotted sill.
Episode 4: Bedford | New Entrance, Old Bricks
Air Date: October 27th, 2011
Summary: Framing up the new roof that will overlay the existing roof; repairing the exterior chimney; weaving in bricks.
Episode 5: Bedford | Yard and New Gable Wall
Air Date: November 3rd, 2011
Summary: Work begins on clearing the backyard. The crew assembles and raises the gable wall for the family room addition and repairs a historic windowsill.
Episode 6: Bedford | New Space Revealed
Air Date: November 10th, 2011
Summary: The family room addition is framed up and sheathed. The crew installs new post supports in the kitchen accommodate a new stove vent hood and repairs the window sash.
Episode 7: Bedford | Insulation, Roofing
Air Date: November 17th, 2011
Summary: The crew tops off cellulose insulation in walls, builds raised beds out of fieldstone, and waterproofs the roof.
Episode 8: Bedford | Kitchen Inspiration
Air Date: November 24th, 2011
Summary: General contractor Tom Silva replaces a rotted post. Window restoration specialist Alison Hardy reinstalls the restored historic window sashes. Host Kevin O'Connor finds electrician Allen Gallant upgrading the electrical service in the garage. Interior designers Dee Elms and Andrew Terrat show Kevin the house that inspired our kitchen. Tom and Kevin remove strip flooring to reveal historic boards.
Episode 9: Bedford | A New Driveway
Air Date: December 1st, 2011
Summary: General contractor Tom Silva installs new red cedar clapboards. Plumbing and heating expert Richard Trethewey helps remove some existing plumbing in the old kitchen. Landscape contractor Roger Cook installs a new asphalt driveway that will later be topped with a rustic finish. Richard shows host Kevin O'Connor how he's solving a rough plumbing problem by using a wet vent in the powder room.
Episode 10: Bedford | Interior Design Ideas
Air Date: December 8th, 2011
Summary: Tom and Norm rebuild the front door surround to eliminate rot. Roger oversees deep root injections to amend and aerate soil. Kevin tours the new space design and sees how it blends modern and rustic elements.
Episode 11: Bedford | Milestones In and Out
Air Date: December 15th, 2011
Summary: Roger Installs a 3,000-pound slab of reclaimed granite for the front step. The crew installs new windows in the addition and insulates old ductwork. Roger spreads a rye grass mix.
Episode 12: Bedford | A Major Milestone
Air Date: December 22nd, 2011
Summary: The crew installs decorative timbers in the new family room along with an A/C condenser. Tom and Kevin fasten mahogany boards to the front entry deck and install a garden shed.
Episode 13: Bedford | On the Right Path
Air Date: December 29th, 2011
Summary: Roger uses old-style bricks for a winding entry path. The crew works to fit a modern kitchen into an ell from the 1700s and installs a zero-clearance gas fireplace. On the outside wainscoting goes in and painting of the farmhouse begins.
Episode 14: Bedford | Doors and Tabletops
Air Date: January 5th, 2012
Summary: The crew restores the panel front door with flexible epoxy and new paint. The new marble island top hides a secret feature, a hole in the top concealing a compost bin. Rich works on the upgrades to the ducted HVAC system. Norm uses two old doors to make sliding barn entry doors.
Episode 15: Bedford | Final Touches
Air Date: January 12nd, 2012
Summary: The crew finishes the driveway and installs a new LED strip light at the old fireplace. The home gets a Colonial-inspired boot scraper and doorknocker as well as a new hot water heater.
Episode 16: Bedford | Final Reveal
Air Date: January 19th, 2012
Summary: Roger installs new and old plant material. The crew puts the finishing touches on the kitchen by installing ceramic backsplash tile and brightens up the parlor and dining room .
Episode 17: Barrington; An Introduction
Air Date: January 26th, 2012
Summary: As the next project starts, demolition begins on the 1950s porch addition and the first floor is gutted.
Episode 18: Barrington; Hurricane Irene
Air Date: February 2nd, 2012
Summary: The crew prepares the house for Hurricane Irene and begins framing the second floor.
Episode 19: Barrington; Building a Clambake!
Air Date: February 9th, 2012
Summary: Installing windows using a custom copper pan for flashing; installing architectural shingles.
Episode 20: Barrington; A Newport Mansion
Air Date: February 16th, 2012
Summary: Exterior shingles; hydronic system integrated with a solar hot water system on the roof.
Episode 21: Barrington; Coastal Landscape
Air Date: February 23rd, 2012
Summary: Installing a custom copper gutter and scupper as well as coastal tolerant and native plants.
Episode 22: Barrington; The Finishes Begin
Air Date: March 1st, 2012
Summary: The Brazilian hardwood garapa is installed on the new deck; red cedar shingles. Red oak flooring and decorative polyurethane brackets are installed.
Episode 23: Barrington; Cherry Kitchen
Air Date: March 8th, 2012
Summary: Replacing cracked asphalt with new concrete pavers in the driveway; using cherry veneers in the kitchen; wall cabinets; setting the new tub.
Episode 24: Barrington; Wall Dressing
Air Date: March 15th, 2012
Summary: Retractable awning; Saratoga soapstone; light fixtures; electric floor warming system.
Episode 25: Barrington; The Finish Line
Air Date: March 22nd, 2012
Summary: Glass tile; installing a garage storage system; cable railing system; installing a gas stove; LED down light.
Episode 26: Barrington; Another Project Wraps
Air Date: March 29th, 2012
Summary: Advanced programmable thermostat; solar shades; dividing the master closet into his and hers spaces; girl's room includes timeless pieces and colors.
Information about series and episodes are provided by TMDB API. If you think that episode information is wrong or missing, please click here to request an update. After your request, update process can take up to 30 minutes.