0 Followers
The Fifteen Billion Pound Railway on IMDB
First Aired: July 16th, 2014
Status: Continuing
Network: BBC Two
Summary: Follow a team of more than 10,000 engineers and construction workers as they race to build a brand new railway under London - Crossrail - London's new Underground.
Next Episode:
New episode date is not available for now
Episode Statistics:
# of Episodes: 9
# of Episodes I watched: 0
# of Episodes I haven't watched: 9
Last Episode I watched: -
Episode Summaries
My Season Progress: 
0 %
Season 4
Episode 1: Episode 1
Air Date: June 12nd, 2022
Summary: With exclusive access to Crossrail Ltd and Transport for London, this final chapter of the series follows the race to fix the railway's high-tech software and systems to launch the new Elizabeth Line in time for the Queen's platinum jubilee.
Episode 2: Episode 2
Air Date: June 19th, 2022
Summary: We follow 83-year-old site manager Jim Forrest - one of the oldest engineers on the project. He joined the Whitechapel Station build in 2009 and has seen it from tunnel boring and concrete pouring to constructing the station steel works.
Information about series and episodes are provided by TMDB API. If you think that episode information is wrong or missing, please click here to request an update. After your request, update process can take up to 30 minutes.